Quick answer

The concrete stairs calculator finds the concrete volume for solid poured steps with an optional top platform from the number of steps, riser height, tread depth and width, in yards, metres and bags.

%
$ /piece
$
Concrete needed
Total rise
28
Total run (incl. platform)
6.67
Weight
7,918
Premix bags
89
Cost with bags
$ 578.50
Cost with ready-mix
$ 293.59

Solid concrete steps are poured as a single block, with each step stacked on the one below. The volume grows quickly with each extra step, so a five-step stoop can need more than a cubic yard. A landing (platform) at the top in front of the door is usually at least 36 in deep.

How to use the Concrete Stairs Calculator

  1. Number of steps
  2. Riser height
  3. Tread depth (run)
  4. Stair width
  5. Top platform depth (0 if none)
  6. Waste
  7. Premix bag size
  8. Price per bag
  9. Ready-mix price
  10. Every result field is editable: type into Concrete needed and Stair width plus every other field update to match.

Results update as you type, and every field accepts the units shown in its menu.

How it works

Enter the number of steps, riser height, tread depth, stair width and the depth of any top platform, plus waste, bag size and prices. The calculator adds the volume of every stacked step and the platform.

Premixed bag yields

Bag Yield Bags per yd³
40 lb 0.30 ft³ 90
50 lb 0.375 ft³ 72
60 lb 0.45 ft³ 60
80 lb 0.60 ft³ 45
25 kg ≈ 0.0117 m³ ≈ 85 per m³

Inputs explained

Field What to enter
Number of steps A number
Riser height Units: in, cm, mm, ft, m
Tread depth (run) Units: in, cm, mm, ft, m
Stair width Units: ft, m, in, yd, cm
Top platform depth (0 if none) Units: ft, m, in, yd, cm
Waste In %
Premix bag size Choose one: 40 lb bag (0.30 ft³), 50 lb bag (0.375 ft³), 60 lb bag (0.45 ft³), 80 lb bag (0.60 ft³) …
Price per bag Units: /piece
Ready-mix price Units: /yd³, /m³, /ft³

What each result means

  • Concrete needed = [Stair width]×([Tread depth (run)]×[Riser height]×[Number of steps]×([Number of steps] + 1)÷2 + [Top platform depth (0 if none)]×[Riser height]×[Number of steps])×(1 + [Waste]÷100)
  • Total rise = [Number of steps]×[Riser height]
  • Total run (incl. platform) = [Number of steps]×[Tread depth (run)] + [Top platform depth (0 if none)]
  • Weight = [Concrete needed]×2400
  • Premix bags = ceil([Concrete needed]÷[Premix bag size])
  • Cost with bags = [Premix bags]×[Price per bag]
  • Cost with ready-mix = [Concrete needed]×[Ready-mix price]

Formula

V = W × [T × R × n (n + 1) ÷ 2 + P × R × n] with n steps, riser R, tread T, width W and top platform depth P

Worked example

Inputs: Number of steps: 4; Riser height: 7 in; Tread depth (run): 11 in; Stair width: 4 ft; Top platform depth (0 if none): 3 ft; Waste: 7 %; Premix bag size: 80 lb bag (0.60 ft³); Price per bag: $6.5 /piece; Ready-mix price: $150 /yd³.
Results: Concrete needed = 1.957 yd³; Total rise = 28 in; Total run (incl. platform) = 6.67 ft; Weight = 7,918 lb; Premix bags = 89; Cost with bags = $578.50; Cost with ready-mix = $293.59.

Frequently asked questions

How much concrete for 3 steps?

With 7 in risers, 11 in treads and a 4 ft width, about 12.8 ft³ (0.48 yd³) without a platform.

What are standard step dimensions?

Risers 4–7¾ in and treads at least 10–11 in (IRC). Keep all risers within ⅜ in of each other.

Can I reduce the concrete?

Fill the core with compacted gravel or rubble, leaving at least 4 in of concrete on every face.

Sources

  1. International Code Council: IRC R311.7.5 Stair treads and risers