Road Base Calculator

Quick answer

The road base calculator works out how much road base (aggregate base course) you need from the area and depth, in cubic yards, cubic metres, tons and tonnes, and estimates the cost from a price per ton or per cubic yard.

%
$
Area
—
Volume needed
—
Weight needed
—
Estimated cost
$ —

Road base (also called aggregate base course, crusher run, DGA or Type 1) is a blend of crushed stone and fines that compacts into a solid, load-bearing layer under driveways, roads, slabs and pavers. Because it is compacted, you need noticeably more loose material than the finished volume – plan on 20–30% extra.

How to use the Road Base Calculator

  1. Material
  2. Custom density
  3. Area shape
  4. Length (or diameter)
  5. Width
  6. Depth
  7. Extra for waste and compaction
  8. Priced by
  9. Price per weight
  10. Price per volume
  11. Every result field is editable: type into Volume needed or any other result and Depth plus every other field update to match.

Results update as you type, and every field accepts the units shown in its menu.

How it works

The calculator finds the area of your rectangle, circle or triangle, multiplies it by the depth and adds the waste allowance to get the volume. Multiplying by the density of the chosen material gives the weight, and the price you enter turns either one into a cost.

Densities used

Material kg/m³ lb/ft³ US tons per yd³
Road base (aggregate base course) 2,243 140.0 1.89
Crusher run / dense-grade aggregate 2,100 131.1 1.77
Recycled concrete road base 1,900 118.6 1.60
Asphalt millings 1,300 81.2 1.10
Type 1 MOT sub-base (UK) 2,100 131.1 1.77

Good to know

A U.S. (short) ton is 2,000 lb; a metric tonne is 1,000 kg (2,204.6 lb). Quarries in the U.S. sell by the short ton, so check which one your quote uses.

Tips for an accurate estimate

  • Plan driveways and paths in layers – a compacted base of larger stone does most of the structural work.
  • Add 10–25% for compaction: loose stone shrinks once it is rolled or driven on.
  • Ask the quarry whether prices are per US ton, metric tonne or cubic yard before comparing quotes.
  • Grade surfaces at 1–2% so water runs off rather than soaking into the base.

Common mistakes to avoid

  • Skipping the base layer or geotextile on soft soil, which leads to ruts and potholes.
  • Using rounded stone (pea gravel, river rock) on surfaces that carry vehicles.
  • Ordering compacted volume when the supplier delivers loose material.

Inputs explained

Field What to enter
Material Choose one: Road base (aggregate base course), Crusher run / dense-grade aggregate, Recycled concrete road base, Asphalt millings …
Custom density Units: kg/m³, lb/ft³, g/cm³, lb/yd³
Area shape Choose one: Rectangle / square, Circle (length = diameter), Triangle (length = base, width = height)
Length (or diameter) Units: ft, m, in, yd, cm
Width Units: ft, m, in, yd, cm
Depth Units: in, cm, mm, ft, m
Extra for waste and compaction In %
Priced by Choose one: Weight (per ton / tonne), Volume (per yd³ / m³)
Price per weight Units: /US ton, /t, /lb, /kg
Price per volume Units: /yd³, /m³, /ft³

Formula

Volume = area × depth × (1 + waste)Weight = volume × densityCost = weight × price per ton (or volume × price per yd³)

Worked example

Inputs — Material: Road base (aggregate base course); Custom density: 1,600 kg/m³; Area shape: Rectangle / square; Length (or diameter): 40 ft; Width: 12 ft; Depth: 6 in; Extra for waste and compaction: 25 %; Priced by: Weight (per ton / tonne); Price per weight: $45 /US ton; Price per volume: $60 /yd³.
Results — Area = 480 ft²; Volume needed = 11.111 yd³; Weight needed = 21.004 US ton; Estimated cost = $945.17.

Frequently asked questions

How thick should road base be?

4–6 in under patios and walkways, 6–8 in for driveways and 8–12 in or more for roads carrying trucks.

How much does road base compact?

Typically 20–30% from loose to compacted, so order extra.

How much does a yard of road base weigh?

About 3,800 lb (1.9 US tons) compacted, or around 1.4–1.6 tons loose.

What formula does the Road Base Calculator use?

Volume = area × depth × (1 + waste).

Sources

  1. The Engineering ToolBox – Bulk densities of materials

Cite this calculator

Speedy Calculator. (2026). Road Base Calculator. Speedy Calculator. https://speedycalculator.com/calculators/construction/road-base/