High-Low Method Calculator

Quick answer

The high-low method calculator separates a mixed cost into its fixed and variable parts using the highest and lowest activity levels, then estimates total cost at any activity level.

$
$
Variable cost per unit
$ 3.00
Total fixed cost
$ 4,000.00
Estimated total cost
$ 26,500.00

The high-low method is a quick way to estimate cost behaviour from past data, using only two points. It is simple but sensitive to unusual months; regression gives a better fit when you have many data points.

How to use the High-Low Method Calculator

  1. Cost at highest activity
  2. Units at highest activity
  3. Cost at lowest activity
  4. Units at lowest activity
  5. Units to estimate

Results update as you type, and every field accepts the units shown in its menu.

How it works

Enter the total cost and units at the highest and lowest activity levels, and the activity level you want to estimate.

Inputs explained

Field What to enter
Cost at highest activity Amount in your currency
Units at highest activity A number
Cost at lowest activity Amount in your currency
Units at lowest activity A number
Units to estimate A number

What each result means

  • Variable cost per unit = ([Cost at highest activity] – [Cost at lowest activity])÷([Units at highest activity] – [Units at lowest activity])
  • Total fixed cost = [Cost at highest activity] – [Variable cost per unit]×[Units at highest activity]
  • Estimated total cost = [Total fixed cost] + [Variable cost per unit]×[Units to estimate]

Example values

How the main result changes when Cost at highest activity changes and everything else stays at the example values above:

Cost at highest activity Estimated total cost
15,500 16,812.5
23,250 21,656.25
31,000 26,500
38,750 31,343.75
46,500 36,187.5
62,000 45,875

Formula

Variable cost per unit = (cost at high − cost at low) ÷ (high units − low units) Fixed cost = cost at high − variable cost × high units Total cost at x = fixed cost + variable cost × x

Worked example

Inputs: Cost at highest activity: $31,000; Units at highest activity: 9,000; Cost at lowest activity: $19,000; Units at lowest activity: 5,000; Units to estimate: 7,500.
Results: Variable cost per unit = $3.00; Total fixed cost = $4,000.00; Estimated total cost = $26,500.00.

Frequently asked questions

What is the high-low method?

A cost-accounting technique that uses the highest and lowest activity points to split fixed and variable costs.

What is its main weakness?

It ignores all data except two points, which may be outliers.

Should I pick the highest cost or the highest activity?

Use the highest and lowest activity levels, not costs.